Ordering organization : Jellanam-do 2007-11-15 ~ 2012-10-19 Total cost : 43,400 million KRW Suspension bridge (L=2.26km) Concrete equirements 290,550㎥
Hantan-gang(river) Dam
ECONEX® SLUMPIA-L ECONEX® AN-88
Classification
|
Civil
Constructor
|
DAELIM
Summary
Ordering organization : Korea Water Resource Corp. Construction period : 2007-02-28 ~ 2014-08-07 Main dam : H 83.5m, L 690m, concrete gravity dam Flux : 2.7 million ton
Imha Dam Spillway
ECONEX® COONA-L
Classification
|
Civil
Constructor
|
DAELIM
Summary
Ordering organization : Korea Water Resource Corp. Construction period : 2006-08-31 ~ 2010-12-14 Designed flux : 8,200 m³/sec (PMF) Tunnels : D 15m x 3 site (L1=379m, L2=421m, L3=462m) Gates : B11.8m x H14.56m x 6 gates (Radial Gate)
Metapolis Dongtan
ECONEX® COONA-230L ECONEX® ECOCRETE
Classification
|
Architecture
Constructor
|
POSCO E&C
Summary
Operator : Korea Land & Housing Corp. 2006.10 - 2010. 7. Total area 462,003㎥ 55-66 floors above ground 5 underground 4 buildings 1,266 households
Ordering organization : Jeollanamdo Provincial Government Construction period : 2001-06-21 ~ 2009-03-31 Connected with National Highway No. 27 to Sorokdo Extension: 3,468M (width 11M, two round trip) Sorok Grand Bridge (L = 1,160M) and two bridges